PROJECT DESCRIPTION:
The Construction and Contracting Division issued an Invitation to Bid on January 29, 2018 and held a Pre-bid conference on February 8, 2018. The bid closed on February 26, 2018 with one response. After review, it was determined that GCON Inc. submitted a responsible, responsive bid package. The Scope of work includes removal of existing generator, replacing Automatic transfer switch, Provide and install a new 480/277V, 3 phase 4/ W. Nema 3R generator in the same location. The generator will be powered by Cummings or Caterpillar as specified. The Contractor will clean and utilize the existing fuel tank, perform preventative maintenance testing and field training.
|